Solar Export Limits UK: G98, G99 and DNO Application Checklist for System Changes
DNO approvalG98G99solar export limitssolar upgradesgrid connection

Solar Export Limits UK: G98, G99 and DNO Application Checklist for System Changes

PPower Suppliers Editorial Team
2026-11-21
7 min read

A practical UK checklist for G98, G99, DNO approval, export limits and paperwork when changing a solar PV, battery or inverter system.

Planning to add solar panels, a battery, an EV charger or a replacement inverter? This guide explains how a proposed change can affect your UK grid connection, export limit and DNO paperwork, with a practical G98-versus-G99 comparison, application checklist and handover record you can revisit before any system modification.

Overview

A solar PV system connected to the public electricity network is not only a collection of panels and equipment. It is also a registered connection with technical limits, protective settings and records held by the installer, property owner, energy supplier and, where relevant, the local Distribution Network Operator (DNO).

The DNO manages the local electricity network. It may need to assess a proposed generator or a change to existing generation before the work is carried out. This is particularly important when an alteration could increase the electricity exported to the network, change the way the system operates during a fault, or combine several generators behind one electricity meter.

G98 and G99 are commonly used connection routes for electricity-generating equipment. The correct route depends on the equipment, total capacity, installation type, connection arrangement and the requirements in force at the time. The applicable limits and submission process can change, so an installer should confirm the current position with the relevant DNO rather than relying on an old certificate or a general internet summary.

An export limit is different from the total rated capacity of the panels. For example, a system may have more panel capacity than the amount it is permitted to send to the grid, provided its inverter and export-control equipment are designed, configured and documented accordingly. A battery may also charge from solar or the grid and discharge through the same connection, so it must be considered as part of the proposed operating arrangement.

What to track

G98 or G99 route

Ask the installer to identify the proposed connection route in writing. In broad terms, G98 is associated with certain smaller, qualifying installations that can follow a simpler notification process, while G99 is associated with installations or arrangements requiring a more involved application, assessment or approval. The distinction is not determined by panel count alone.

Record the basis for the decision, including the equipment type, inverter rating, number of phases, existing generation and any battery or export-control system. If the installation is being changed, the existing connection history matters as much as the new equipment.

Point to compareG98G99
Typical useCertain qualifying smaller generating installationsInstallations or arrangements requiring a more detailed connection process
ProcessUsually notification-based where the criteria are metMay require an application, technical information and DNO review
What determines eligibilityCurrent technical requirements, equipment and connection arrangementCapacity, phases, site configuration, protection and network assessment requirements
Owner's actionKeep the notification and commissioning evidenceKeep the approval, correspondence, agreed limits and commissioning evidence

This table is a planning aid, not a substitute for current DNO or installer confirmation. A system that previously followed a notification route may need further review if its inverter, battery, export setting or connection arrangement changes.

Approved export capacity

Keep a clear record of the approved or declared export capacity, expressed in the units used by the DNO documentation. Do not assume that the maximum output shown on a panel datasheet is the approved export limit. Check the inverter's configured export limit, the capability of any export meter or controller, and whether the setting is protected against unauthorised changes.

Equipment and protection

Track the make and model of each inverter, battery inverter, hybrid inverter, battery, export-control device and generation meter. Record firmware or configuration details where they form part of the commissioning evidence. A replacement inverter with a similar headline rating is not automatically a like-for-like replacement for connection purposes.

Documents and certificates

Your system file should include the electrical installation certificate, commissioning record, single-line diagram, inverter settings, test results, product certificates where supplied, DNO notification or approval, and details of any export-limitation scheme. For a commercial site, also retain the site plan, meter details, phases, protection information and responsible contact.

Interaction with other equipment

Adding an EV charger does not necessarily create a new generation connection, but its load, controls and smart charging arrangement can affect the design and assessment of the wider electrical installation. A battery can alter import and export behaviour even when no new panels are installed. Treat every proposed change as a system change until a competent designer confirms otherwise.

Cadence and checkpoints

Use a short review before every modification and a fuller record check at least periodically. A monthly review is useful while a project is being designed or commissioned; for an established system, a quarterly or annual document check can help keep records aligned with the equipment on site.

Before requesting quotes

  1. Photograph the existing inverter, meter, consumer unit, isolators, battery and relevant labels.
  2. Locate the original DNO notification or approval and note the approved export capacity.
  3. List all existing generation, storage and control equipment, including equipment added after the original installation.
  4. Describe the proposed change precisely: additional panels, inverter replacement, battery installation, EV integration or export-control alteration.
  5. Ask each installer to state whether they expect a G98 notification, a G99 application or another DNO process, and why.

Before approving the design

Check that the quotation identifies who will make the DNO submission, who pays any stated application or design charges, and what happens if the DNO requires a different export limit or network upgrade. Confirm whether the price includes commissioning, notification, labels, updated diagrams and handover documents.

At commissioning

Request a final record showing the installed equipment, programmed export limit, test results and connection route. The commissioning record should match the physical installation. If a controller limits export, ask where it is installed, how it is tested and what evidence confirms that it operates as intended.

After handover

Store the documents in one digital folder and one accessible backup. Record the date of commissioning, installer contact, DNO reference, meter details and warranty information. Update the file if firmware, inverter settings or control equipment are changed.

How to interpret changes

A proposed increase in panel capacity does not automatically mean a proportionate increase in grid export. The key question is how the complete system can operate at the point of connection. A battery may absorb surplus generation, but that does not remove the need to assess its inverter, controls and possible discharge to the network.

If an installer proposes an export limit, ask whether it is a fixed setting, a dynamic control arrangement or a condition of the DNO approval. Ask how loss of communications, sensor failure or a controller fault is handled. The answer should be documented rather than left as a verbal assurance.

Be cautious when a quote describes equipment as a “like-for-like” replacement. Confirm whether the replacement has the same relevant rating, phase arrangement, protection behaviour and connection certification. If any of these differ, the DNO or installer may require a new notification, application or assessment.

Compare the proposed design with the existing records, not just with the sales specification. If the approved export capacity is lower than the system's potential output, check that the limitation is included in the design and commissioning tests. If the proposed system exceeds the existing approval, do not proceed on the assumption that a later notification will resolve it.

For business premises, also consider changes in operating hours, multiple meters, standby generation and future expansion. Warehouse solar installations, farm solar panels and other larger sites may have more complex site arrangements than a typical domestic connection. A competent installer should identify these at survey stage.

When to revisit

Revisit this checklist before any solar PV upgrade, inverter replacement, battery installation, EV charger integration or change to export-control settings. It is also sensible to review the file when the property changes ownership, when an installer or maintenance contractor changes, or when monitoring suggests that the system is exporting differently from its documented settings.

Set a quarterly reminder while a project is active and an annual reminder once the system is stable. At each review, check the current ENA guidance, the relevant DNO's submission instructions and the terminology used on its forms. Requirements, thresholds, certification routes and online application processes can be revised.

Handover record template

  • Site address and electricity meter number
  • DNO name, reference number and connection date
  • Connection route: G98, G99 or other confirmed route
  • Approved or declared export capacity
  • Panel, inverter, battery and export-controller make and model
  • Phase arrangement and relevant electrical ratings
  • Configured export limit and method of control
  • Commissioning date, test results and installer details
  • Single-line diagram, certificates, approval or notification documents
  • Date of next review and reason for any planned change

Before signing off new work, ask the installer to complete this record and explain any difference from the original system. If the proposed change is unclear, pause the work and obtain written confirmation of the DNO route and export limit. Keeping accurate records is the simplest way to protect the system's compliance, make future upgrades easier and give the next installer a reliable starting point.

For related planning, see our solar panel and inverter compatibility checklist, solar EV charging guide and MCS certified solar installer quote checklist.

Related Topics

#DNO approval#G98#G99#solar export limits#solar upgrades#grid connection